Project Details
Project: KP Snacks Hellaby
Client: KP Snacks
Contractor: Environmental Engineering UK
Duration: 8 Months
In mid 2014 working alongside Environmental Engineering UK we carried out the electrical installations at the brand new KP snacks production site in Hellaby, Yorkshire. High level containment, sub main cables, distribution boards, 110 volt transformers, machine power supplies and metering where all undertaken by Thomas Halliwell who have taken their expansive installation experience and knowledge into the food preparation industry. Providing the above to suit the special requirements needed within this industry.