Phones4U Arena (Formerly MEN Arena), Manchester
Project Details
Project: Phones4U Arena (Formerly MEN Arena), Manchester
Client: SMG Group
Contrator: Multitrade Plus
Duration: 12 Weeks
We provided the electrical installation to the refurbishment of 29 Cooperate boxes at the M.E.N. arena. This work package entailed the high specification installation of new light fittings, general power, hand dryers and LED lighting strips. This programme was again strict and needed to be completed within the time frames to ensure the boxes where useable as the arena was still in use for performances and shows.
Additional Images